Case Study
Thortech Bridges & Marine undertook a resurfacing project at Quakers Yard, Merthyr Tydfil with 3 separate footbridges requiring maintenance measuring
Thortech Bridges & Marine undertook a resurfacing project at Quakers Yard, Merthyr Tydfil with 3 separate footbridges requiring maintenance measuring
CASE STUDY SYNOPSIS Thortech Bridges & Marine undertook a resurfacing project at Quakers Yard, Merthyr Tydfil with 3 separate footbridges requiring maintenance meas- uring 100m 2 in total. BRIEF Quakers Yard’s Footbridge is based down Merthyr Tydfil with 3 separate footbridges supplying access to the local amenities. New, reliable surfacing was required so the footbridge could continue to provide a safe crossing for the public.