Case Study

Thermal Sewage Sludge Disposal

Thermal Sewage Sludge Disposal

Pages 2 Pages

CASE STORY Stuttgart Mühlhausen The German state capital Stuttgart ordered in 2003 the construction of a new line of sewage sludge incineration. The plant has been built on the main premises of Mühlhausen’s sewage treatment plant and replaces incineration line no. 1. Following the drying process, the sewage sludge is incinerated together with the screenings in a fluidised bed boiler. The generated steam is led into a back pressure t

Join for free to read