Case Study

The Terex RT 100US outlifts 130 US ton crane on construction project

The Terex RT 100US outlifts 130 US ton crane on construction project

Pages 5 Pages

The Terex RT 100US outlifts 130 US ton crane on construction project by ZWEIBRÜCKEN – September 11, 2018 – Lattice boom crawler cranes typically steal the wind-turbine-installation show and with good reason. Decked with their turbine packages, long booms and heavy counterweight, they are the most visible part of the operation, called on to lift turbine components weighing up to 300 U.S. tons (272 tonnes). As with any show, however, much behind-the-scenes prep work must be completed in advance of wind turbine assembly, and this is left to rugged and versatile rough terrain cranes. Even though this work doesn’t get the accolades – and is seldom noticed by the public – it must be completed quickly, efficiently and on time before the main lifting show can go on. The venue this time for IEA Con

Join for free to read