Case Study
The SVC Light at the Trierer Stahlwerk
The SVC Light at the Trierer Stahlwerk FACTS In 2000, an SVC Light rated at 20 kV, 0-38 Mvar was supplied to Amprion GmbH by ABB and installed at Trierer Stahlwerk in Trier, a steel plant taking its electric power from the Amprion grid. The SVC Light was supplied on a turn- key base. The purpose of the installation is to safeguard adequate power quality in the feeding grid at all times in conjunction with the operation of the steel plant.