Case Study
The Supply and Installation of a Flood Warning System for City of London
Flow - Level - Water Quality Groundwater - Meteorology - Telemetry Abstract RS Hydro were awarded the contract to supply install and maintain a network of water level monitoring, automatic rain gauge stations and a weather station for the City of London Corporation to moni- tor the water levels and rainfall at Hampstead Heath. In total five ponds in the two separate chains of ponds on the heath are moni- tored and supported by auto