Case Study

The Sea Locks Project

The Sea Locks Project

Pages 2 Pages

Background Project Sea Lock has over 70 locks and accommodates cargo boats up to 300 feet long. The locks are primarily used to prevent water from flooding the main- land while still allowing a viable shipping channel. The Project is a major contribu- tor to this host city’s economy as a ship- ping and receiving lane. Security Challenges Before DVTEL’s Latitude Video Manage- ment System was installed, each lock was either individually

Join for free to read