Case Study

The recently opened Terminal 2 at Guangzhou Baiyun International Airports relies on an end-to-end cabling solution from Datwyler.

The recently opened Terminal 2 at Guangzhou Baiyun International Airports relies on an end-to-end cabling solution from Datwyler.

Pages 2 Pages

www.cabling.datwyler.com 1 CASE STUDY Datwyler’s industry-leading cabling solutions and engin- eering services make it a sought-after partner in the equipment of airports. In China many major airports, including the international airports in Shanghai, Guang- zhou, Kunming, Xi’an, Shenyang und Tianjin, also rely on Datwyler’s integrated IT infrastructure solutions. In order to meet these special challenges Datwyler has for years been developing new products and cutting-edge tech- nologies which combine top quality with the greatest possible safety and high environmental standards. Guangzhou Baiyun International Airport is one of the three biggest airports in China, with a passenger through- put of 65 million in 2017. These passenger numbers mean that it is the “singl

Join for free to read