The Rack system greatly reduced Dow’s electric consumption, saving 620,000 kWh or $62,000 annually.

The Rack system greatly reduced Dow’s electric consumption, saving 620,000 kWh or $62,000 annually.

4790 West 73 rd Street I Indianapolis, Indiana 46268 Phone: 317-290-8500 I Fax: 317-290-1900 www.aesrack.com Project Identification Customer: DOW North America Location: Plaquemine, Louisiana Design Specifications Facility Warehouse 800,000’ x 36’ High Summer Operation 70 ° – 94 ° Winter Operation 70°-50° Case Study Report Air Energy Systems, Inc. Bill Maher bmaher@aesrack.com Project Challenge: DOW Chemical invested $1.3 billion dollars into their Louisiana Operations, Dow North America. This included an 800,000’ distribution center dedicated to manufacturing and distributing Dow’s high-performance polyethylene. Equipment Solution: Air Energy provided (15) ER-242 rated at 42,000 cfm. The (15) Racks were inc