Case Study
The Project involves the construction of a new MRT System that will connect the capital city of Taipei to the Taoyuan International Airport
The Project involves the construction of a new MRT System that will connect the capital city of Taipei to the Taoyuan International Airport
Project Highlights: The Project involves the construction of a new MRT System that will connect the capital city of Taipei to the Taoyuan International Airport, stopping at five important stations along the route . Service on the new MRT System is slated to begin in 2013. This portion of the Project will link the elevated section of the system between stations A7 and A8 (1k+040) to stations A11 and A12 (0k+605), and involves the detail design and construction supervision of four new elevated stations (A8, A9, A10, A11). The total length of the new MRT section will include 13.9 kilometers of elevated track, along with a 354 meters long elevated structure connecting the main line to Luzhu Depot, and a 136-meter embankment. The scope of project involves the detailed design and construction su