Case Study
The Polaniec Power Plant Unit
logo Deliveries for energy sector In the power plant in Polaniec, Poland, a new biomass fuelled unit is currently under construction. A boiler with the approximate area of 2,500 m2 will reach at the height of almost 67 m. Ruukki delivered to its customer, Foster Wheeler Energia Polska, steel structures and foundations for the boiler house and auxiliary buildings. Ruukki was also responsible for the design and assembly of structures. Steel structu