The Point

The Point

Pages 2 Pages

2 deadline of February 1996. To meet these tight time constraints, a steel framed building was selected and a fast-track construction process was adopted, requiring close liaison between builder and architect. The project was success- fully completed on time and on budget and it won the prestigious 1996 Australian Institute of Steel Construction award for architectural steel design in Victoria. Architecture A two-storey curved facade of tinted gl