Case Study
The Missing Link
12 _ MONIT OR Connecting the British Isles and the European Continent, the first natural gas pipeline is currently under construction between Balgzand, Netherlands, and Bacton, UK. It runs some 230 kilometers across the seabed of the North Sea and will be powered by a Siemens-built state-of-the-art compression solution. The Missing Link even play an important role in connecting Russian gas volumes to the UK. GETTING STARTED Groundwork, pipeline l