Case Study
The Installation Of A Biomass Heat Cabin At The Aviemore Medical Center
Installation of Biomass Heat Cabin at Aviemore Medical Centre as part of wider NHS Highland initiative to save £2M a year. In 2013 NHS Highland commissioned HWEnergy to install seven heat cabins and four additional biomass systems across 10 sites as part of its ambitious carbon reduction plan. NHS Aviemore is one of these sites. Previously paying £12,000 a year for heating and hot water using their oil based system, the new biomass i