Case Study

The Deep, Hull

The Deep, Hull

Pages 3 Pages

Case Study: The Deep, Hull Aveso increase access for all with the first Changing Places installation in an aquarium The Deep, Hull is one of the UK’s biggest aquariums, opening its doors everyday to a wide range of peo- ple. This makes accessibility a real priority for the centre, having noticed that their current accessible toi- lets do not cater for the 250,000 people in the UK who require additional support. In March 2018, the Changing Places facility was opened to the public, all the equipment designed and in- stalled by the Aveso team - The Deep adding a quirky, marine theme. The toilet is located on the ground floor of the attraction, close to the main reception desk. The Deep felt it was important to provide a Changing Places facility not only for its visitors but for those

Join for free to read