Case Study

The controllable series capacitor at Kanawha River

The controllable series capacitor at Kanawha River

Pages 2 Pages

The controllable series capacitor at Kanawha River In 1991 a segmented series capacitor was installed by ABB in the south-eastern part of the American Electric Power Service Corporation (AEP) system. This grid includes lines at 765 kV, 345 kV and 138 kV. There series capacitor was installed in the Kanawha River – Funk 345 kV line, which is 174 km long. An installation that provides flexibility Before the installation of the series capacitor,

Join for free to read