Case Study
The Boeing Company, California
THE BOEING COMPANY, CALIFORNIA Contract Details Contract Type: Design Build, Combined Hot Water and Chilled Water Plant Summary Boeing’s campus in Huntington Beach, California, was constructed in 1963. The campus was old, inefficient, and unreliable. The plant was an entirely gas-fired operation, and much of the equipment was in disrepair. There were a total of five gas-driven centrifugal R-11 chillers producing 5,300 tons, as well