Case Study
The Blood Vessel Of Central Asia
After an extensive site survey was done alongside the proposed route, we have come up with the following solution: 7-Site RD98X Repeaters linked via 5.8 GHz Microwave link; 35-PD78X Portable Radios used by personnel roaming up & down the construction site; 35-MD78X Mobile Radios were mounted in the construction vehicles. Solution By carefully selecting and planning the correct positioning of the Repeater sites, we have come up with a solution