Case Study
Texas Department Of Transportation
CASE STUDY TEXAS DEPARTMENT OF TRANSPORTATION Bridge Pile Protection Project Data • Excellent Bond Strength to Steel and Concrete • Long Pot Life Which Allows Premixing to Assure Proper Ratio • Can Be Pumped With a Peristaltic or Piston Pump (No Plural Pump Equipment Required) • Easy Clean Up with Liquid Soap Solution (No Harmful Solvents Required) • SeaShield 550 Epoxy Grout Can Be Pumped or Poured The Texas Department of Transportation (DOT) ap