Case Study

TEXAS A&M Rellis Campus

TEXAS A&M Rellis Campus

Case Study: Education TEXAS A&M RELLIS CAMPUS The design needed to accommodate the install of 6 boilers at the TAMU-RELLIS Campus Central Power Plant, while allowing room for 6 more boilers in anticipation of future growth. The decision to add aluminum heat exchangers provided a need for water treatment to keep the PH in operating range of specifications. Regulators also had to be appropriately positioned to ensure proper psi for the expansive system. Challenges Introduction Texas A&M University is a public research university in College Station, Texas. It was founded in 1876. As of 2020, Texas A&M’s student body is the largest in the United States. As such a large institution, expansions needed to be made to accommodate the growing amount of attendees. What was formerly th

Join for free to read