ROV Case Study Tetra’s Challenge Delta SubSea’s Solutions •? Seacor Diamond mobilized on November 15 th and was completed on November 22 nd , 2013 •? DSS delivered one Schilling HD 150hp ROV and logged 192 ROV dive hours without any downtime •? Tetra required two ROVs and IMR Vessel for work at East Cameron •? The project work scope at East Cameron entailed: –? Surveyed downed structure at EC 328 –? Inspected trunion / hook storag