Case Study

Terrenganu #2 CALM

Terrenganu #2 CALM

Pages 2 Pages

Scope of Work Designed, constructed and installed a replacement CALM system to accommodate 35,000 to 85,000 dwt tankers in 20m water depth. The system is linked via four 18-in. pipelines to a refinery located two miles away. General Description Client Name: Petronas Carigali Contract Award: April 1998 Installation Date: April 1999 Application: Multi Product (Crude oil, fuel oil, diesel and naphtha) Import and Export Project

Join for free to read