Case Study

Terex CTL 430-24 carries the load during library reconstruction

Terex CTL 430-24 carries the load during library reconstruction

Pages 6 Pages

Terex CTL 430-24 carries the load during library reconstruction ZWEIBRÜCKEN, Germany – December 6, 2017 – New construction projects always come with a set of challenges, but the site and lifting needs are usually straight forward enough that several different crane options fit the requirements. Building reconstruction, on the other hand, typically comes with its own unique challenges. Often, there are obstacles in the way that make selecting the right crane much more difficult, and bidding the right crane can be the difference between getting the job and moving on to the next opportunity. Major metropolitan downtown reconstruction projects offer even more challenges for the lifting contractor. It is a virtual certainty that the site will be surrounded by structures on all sides, ma

Join for free to read