Tennessee Valley Authority Power Plants Seismic Assessments

Tennessee Valley Authority Power Plants Seismic Assessments

Pages 1 Pages

Project Brief www.geocomp.com Tennessee Valley Authority Power Plants Seismic Assessments Background & Project Challenges The Tennessee Valley Authority (TVA) is the largest public power utility in the United States, operating 10 coal-fired power plants. In 2015, the United States Environmental Protection Agency (EPA) put into effect national regulations and requirements for the safe disposal of coal combustion residuals (CCR), including a requirement that a qualified engineer demonstrate that each impoundment and landfill of CCRs have adequate structural stability for both static and seismic loads. If it is determined that TVA’s CCR impoundments do not meet the minimum required factors of safety, it will be necessary for TVA to either close or remediate these facilities at co