Case Study

Tender Design Services for a New Shipyard Development

Tender Design Services for a New Shipyard Development

Pages 1 Pages

Tender Design Services for a New Shipyard Development The Requirement BMT assisted the customer in the delivery of Tender Design Services for the development of Jurong Shipyard (Phase 2), an integrated facility at Tuas South Singapore. During the time of delivery, the proposed yard comprised three dry docks, two wharves, one quay, one finger pier and other ancillary facilities such as underground pump rooms, crane rail foundations, etc. Infrastructure works consisted of the main and secondary electrical sub-stations, and surrounding infrastructure works such as underground and open cable and pipe trenches, road pavement, sewerage, drainage, etc. What We Delivered The services delivered by BMT include tender design services for: Three Dry Docks; Two Wharves; One Quay Structure; One Finger P

Join for free to read