Case Study
Temporary Structures for Dance Studios
Six temporary structures were needed at an international dance school. The school was seeing an increasing number of students, so instead of having to turn them away, they decided to increase capacity and dance studio space available. - With 8 structures now installed on site the school is very confident in the HTS product and strong German design and engineering. The aesthetics, quality and functionality of the structures was key to this project, all of which were first class and able to suitably represent the school and the high level of training they deliver.