The existing culvert (picture to the right) was inadequate in both high water elevation and hydraulic flow for what was required at the stream crossing. This caused many access problems and was vulnerable to washout for the 100 year flood. The TEG design included the Tricon Precast Shuttabloc Retaining Wall System and the TxDOT Heavy Double Tee Bridge Beams. The Double Tee Bridge Beams included an integral driving surface so that no c