Case Study

Technical Memorandum

Technical Memorandum

? Page 1 Technical Memorandum To: Ron Ponte (Tata & Howard Engineers) From: Dean Gregory (CDG Environmental LLC) CC: Dave Morris (CDG) Date: December 29, 2009 Re: CDG Chlorine Dioxide Pilot Project at the Town of Canton 1.0 Background In order to obtain New Technology Approval from the MA DEP, CDG Environmental LLC conducted a 5-day pilot study at a groundwater pumping station in the Town of Canton. A full- scale CDG Gas:Solid™ chlorin

Join for free to read