Case Study

Technical Line Review Turns Into $218,369 In Cost Reductions

Technical Line Review Turns Into $218,369 In Cost Reductions

Pages 1 Pages

TECHNICAL LINE REVIEW TURNS INTO $218,369 IN COST REDUCTIONS CHALLENGE During an assembly line review with a potential customer, the Field team noticed that a considerable amount of meter boxes were being scrapped and removed each day. Upon further review of the assembly process, the team observed that the workers were having problems with tapped thread quality and recess damage. A slotted pan head machine screw was being driven i

Join for free to read