Case StudyCase Study The Challenge The main challenge faced by Team17 was the tight deadline by which everything needed to be completed the week before the move with minimum downtime. The reason being, this would affect the day to day back office and production systems, failure to achieve this would have a negative impact on games production. It was very clear after a series of meetings, that providing system upgrades to the existing infrastructure was achievable, however this wouldn’t address the requirements of keeping the business up and running once the new studio was ready to move in to. ICC recommended that alongside these upgrades Team17 invest in a new purpose- built data centre and install a new data cabling infrastructure with an identical server and san hardware