Case Study
TCE Remediation at an Operating Railroad Fueling Facility
TRS Group, Inc. (TRS) worked as a subcontractor to Kennedy Jenks Consultants (KJ) to remediate trichloro- ethene (TCE) in soil during the winter months in Eastern Montana. The project was performed for a firm fixed price based on the TRS standard contract that included installing and operating the ERH system until either the remedial goal was achieved or the design energy was applied, whichever occurred first. The remedial goal was to reduc