Case Study
Tata Power Trombay Retrofit
TATA POWER TROMBAY RETROFIT NEW BARRIER TYPE FILTER SYSTEM AND DIVERTER DAMPER REFURBISHMENT FOR GAS FIRED UNIT 7 THE CHALLENGE Tata Power was looking for a retrofit solution of Air Intake System and Diverter Damper for their gas-fired Unit 7. Camfil Power Systems was awarded the contract through Siemens for supply and super- vision of Air Intake System and through Tata Power for Diverter Damper, which specified 6 months from order to com