Case Study

Task Master

Task Master

Pages 1 Pages

Case Study 1 : Task Master Customer : Seco Warwick Allied Pvt Ltd A/c. Kalyani Thermal Pune Challenge : Client has 11 heat treatment furnaces placed in two parallel rows alongwith input and output material conveyors at respective ends. These furnaces are to be fed with material to be heat treated as per the program. Each pallet weighing approx 1.2Tons at overhang of 2mtrs from system centre. The furnace opening and closing time is to be m

Join for free to read