Case Study
Tarrant Regional Water District Satisfies Growing Production Demands Using Advanced Reliability
WATER & WASTEWATER Tarrant Regional Water District Satisfies Growing Production Demands Using Advanced Reliability RESULTS • Factory acceptance testing accuracy increased 100% • Additional staff requirements for future pumping stations reduced 50% • Emergency maintenance cost reduced 20% • Unplanned critical mechanical failures minimized APPLICATION Water storage, pumping, and distribution CUSTOMER Tarrant Regional Water District. Tarrant serves over two million people in Fort Worth, Texas and outly- ing communities by supplying water to area treatment plants. It owns and operates six pumping stations in a 150 square mile area. CHALLENGE To satisfy the growing water demand in the Fort Worth area, the water supply system output has increased from 50% to 80% of capaci- ty. This has removed