Case Study
Tanamai TE2 Shaft Construction
Case Study Project: Tanamai TE2 Shaft Construction Client RUC Cementation Mining Location Newmont: Dead Bullock Soak Mine. Tanami, NT Australia Duration August 2018 to Present Services Survey Support to Shaft Construction mine surveyPLUS Mine Survey Plus was engaged by RUC to provide full survey support for construction of a 210m deep 5.5m diameter concrete lined shaft. This is phase one of construction of the overall ore hoist shaft which will reach 1500m when complete. Cutting edge methodology was devised to allow for precision survey control in a testing vertically constrained environment. This included Least Square adjustments on all survey control and cross referencing of position periodically using plumblines with prisms attached. Project Scope Excavation, shuttering alignm