Case Study

Tampa Port Authority: Beyond the Cusp - Florida's Largest Port Goes LED

Tampa Port Authority: Beyond the Cusp - Florida's Largest Port Goes LED

Pages 2 Pages

Project: channelside entertainment District Location: t ampa Port authority, Florida cost: $13 million engineer / contractor: colwill engineering Design Build, inc. Design BUiLD contractor: Kraft construction, inc. architect: hKs KiM Lighting ProDUcts: PgL7 LeD, PgL5, W arP9 hiD (upper deck) WeBsite: www.tampaport.com Tampa por T auThoriTy: beyond The CuSp FLorida'S LargeST por T goeS Led real solutions number 2010-2 Kim Lightin

Join for free to read