Case Study

Tampa General Hospital CVTOR

Tampa General Hospital CVTOR

Pages 2 Pages

Repurposing underused space with the addition of three operating rooms including a Hybrid OR was the first phase of this massive renovation at Tampa General Hospital. www.tombarrow.com Case Study Tampa General Hospital CVTOR Architect: Gresham Smith and Partners Engineer: Smith Seckman Reid, Inc. Contractor: SKANSKA Mechanical: BCH Mechanical With very limited space between the existing joist and new ceiling height require- ments for attach

Join for free to read