Client - Cardy Construction Limited Completion date - March 2015 Services required - Health and Safety Advice, Training, Auditing, Safety Procurement The works to construct the executive lounge included: • Installation of partitions. • Installation of raised flooring and tanking to wet areas. • Installation of M&E for air-conditioning and recirculation. • Installation of low risk kitchen areas • Installation of fire alarm systems. • Stud walling, painting, decorating and tiling. • Installation of LED feature lighting. The works were undertaken within a live operational airport during day and night time possessions and Hamilton Deed have been involved in this project from its inception and has provided the following services: • Health and Safety Advice and Consultancy. • Contractor Vettin