Case Study

Sydenham Farm, Bridgwater

Sydenham Farm, Bridgwater

Pages 2 Pages

september 2011 sydenham farm, bridgwater case study groundworks mabey hire Ground Conditions Bad ground - slightly sandy clay at several levels, followed by silt High water table - water shown at -2600mm Equipment Frames - SuperShaft Brace M12 Sheets - 8m/3500mm toe-in Installation Extras Welded cleats Excavation Width - 9.7m Depth - 3.4m Sub-Contractors Highfield Tunnelling, Somerset Length - 14.5m ank installation at the new Sydenham Farm

Join for free to read