Case Study
Swift and Successful Load Bank Testing Enables On-Time and On-Budget Light Rail System
LOAD BANK SOLUTIONS Our Knowledge, Your Power. Swift and Successful Load Bank Testing Enables On-Time and On-Budget Light Rail SystemComRent.com • 888.881.7118 © ComRent International, LLC 2 The Challenge Not all tests are planned. During construction of a light rail system from the remote airport to the major metropolitan area of Denver, CO, it was determined that surge protection needed to be confirmed. The combined urgency of the testi