Swansea Maliphant Intercity Express Depot (Hitachi)

Swansea Maliphant Intercity Express Depot (Hitachi)

Pages 2 Pages

Main steel installation Swansea Maliphant Intercity Express Depot (Hitachi) SWANSEA VALUE £750K MAY 2015 - JULY 2015 MAIN STEEL SPS SWITCHING HEADSPANS “South Wales main line depot operated by Hitachi Rail Europe” RAILWAY ELECTRIFICATION RAILWAY ELECTRIFICATION P od-Trak were contracted to supply and install all the OLE required to electrify the Hitachi-operated depot at Swansea. Works included the supply and installation of transfer plates, structures, SPS, headspans, switching and bonding. The installation of the contact wire was omitted from the scope to reduce the risk of theft, as the depot will not go live until the Great Western Electrification reaches Swansea. Works also included the installation of structures along the NWR main line. With careful planni