Case Study
SVC to stabilize 800 kV transmission system in Venezuela
SVC to stabilize 800 kV transmission system in Venezuela FACTS Caracas La Horqueta San Gerónimo Guri BRAZIL VENEZUELA COLOMBIA SVC SVC During 1986, ABB commissioned two static var compensators (SVC) owned by C.V.G. Electrificación del Caroni C.A. (EDELCA), Venezuela, at San Gerónimo and La Horqueta substations in their 800 kV network. The compensators were delivered on a turnkey basis, includ- ing all equipment, transport to site, civil wor