Case Study
SVC: a cost and time effective option to a 330 kV grid expansion
SVC: a cost and time effective option to a 330 kV grid expansion Power consumption is increasing at a considerable pace in Western Australia due to the resources boom and the associ- ated population increase. Western Power, owner and opera- tor of the grid infrastructure, was studying various options to accommodate increasing levels of power transfer from independent generating facilities in the south-west without destabilising grid voltage