Case Study
Surveying an above ground Pump Station, Atlanta, Georgia , USA
Case Study: Surveying an above ground Pump Station, Atlanta, Georgia, USA Date: July 2015 Location: Atlanta, Georgia The Survey The task involved the survey of the various structures and pipes in an above ground pump station, with the requirement for accuracy within the range of 1 to 3 centimeters (3 to 9 hundredths of a foot). Original Effort Estimate The original effort estimate for a survey of the structure