Surepharm had a requirement for more coating capacity but had limited space available within their Burton on Trent factory.

Surepharm had a requirement for more coating capacity but had limited space available within their Burton on Trent factory.

Case Study (Installation) Like many customers, Surepharm found themselves with a requirement for more coating capacity but had limited space available within their Burton on Trent factory. The requirement was for a 350Kg size machine, but the only area available for installation was on the third floor of the building and internal access was restricted. This route would also have required closure of the very busy production area during the installation phase. The only realistic option was to install the machine through a window, with an opening of 2.1m wide and 1.5m high. But that was not the only restriction - the window faced onto a courtyard with no access for lifting equipment. The solution was to split the