Case Study

Supporting Vault 9 Construction at the Low Level Waste Repository

Supporting Vault 9 Construction at the Low Level Waste Repository

Now OFFICIALLY the UK’s best performing rail freight operator Major Construction Project Support Supporting Vault 9 Construction at the Low Level Waste Repository The Challenge The construction of Vault 9 to provide urgently needed Low Level Waste disposal capacity was essential to keep the UK’s nuclear decommissioning programme on track to meet its targets. The project required timed deliveries of over 140,000 tonnes of aggregates and other bui

Join for free to read