Case Study

Supplying a 220kW Herz® BioMatic installing a retrofit heating system

Supplying a 220kW Herz® BioMatic installing a retrofit heating system

Pages 1 Pages

Institute for Manufacturing UNIVERSITY OF CAMBRIDGE Part of the University of Cambridge’s Engineering department, the Institute for Manufacturing brings together management, policy and technology in engineering disciplines. The Institute is located in the Alan Reece Building, a purpose-built building on the university’s West Cambridge site, which was opened in November 2009. Contracted through Clean Room Construction, Rural Energy were comm

Join for free to read