Suites @ Cairnhill: Top down Construction using 3CC to the Basement wall, slab and E-deck

Suites @ Cairnhill: Top down Construction using 3CC to the Basement wall, slab and E-deck

Pages 2 Pages

Project Page: Suites @ Cairnhill 1 / 2 Suites @ Cairnhill Residential Development by Hoi Hup Realty. It is a Top down Construction using 3CC to the Basement wall, slab and E-deck. Everdure Caltite were used on the Roof slab, Suspended Swimming Pool and Jacuzzi Pond. The Main Contractor has pond the Swimming pool for 14 days before proceed with tiling work. We only went back to grout 4 seepage locations and all were fill up with water after we done up the defects. Till today, all remains well. Completion Date: Dec 1, 2010 Architect: JGP Contractor: Straits Construction Structural engineer: KTP Products Used: Everdure Caltite, 3CC Address: Anthony Road, , Singapore, Singapore Type: Residential Powered by TCPDF (www.tcpdf.org) 2 / 2