• SOLUTION SETS
  • NEWSLETTERS
  • LOGIN
  • Follow us on   Upload your Case Studies  
    JOIN CONTENTREE
SIGN UP
Home

Case Study

Successful EAF Revamping Project at TMK Resita (Romania)

Successful EAF Revamping Project at TMK Resita (Romania)

Successful EAF Revamping Project at TMK Resita (Romania)

BSE America
Pages 2 Pages

Excellence Story Excellence Story January 2010 ”The most smooth and professionally

Join for free to read

Related Solution Sets

Electric Arc Furnaces (EAF)
Iron & Steel Steel Industry

You Might Also Like


Romania
Case Study Romania
i2O Water

Comprehensive Ladle Furnace Installation at Mittal Steel Hunedoara, Romania
Case Study Comprehensive Ladle Furnace Installation at Mittal Steel…
BSE America

EAF Dust
Case Study EAF Dust
FEECO International

TMK Group Enhances Network Management with Entuity
Case Study TMK Group Enhances Network Management with Entuity
Entuity Network Analytics

More from BSE America


Comprehensive Ladle Furnace Installation at Mittal Steel Hunedoara, Romania
Case Study Comprehensive Ladle Furnace Installation at Mittal Steel…
BSE America

Revamping of two 140t DC twin-shell furnaces at Posco, Republic of Korea
Case Study Revamping of two 140t DC twin-shell furnaces at Posco, Republic…
BSE America

Dedusting revamping of two 150t DC twin-shell furnaces at Dragon Steel Corporation, Taiwan
Case Study Dedusting revamping of two 150t DC twin-shell furnaces at Dragon…
BSE America

EAF and offgas system optimisation project at Kalyani (India) with supply of high temperature quenching, damper control and electrode regulation syste
Case Study EAF and offgas system optimisation project at Kalyani (India)…
BSE America
B2B solutions from all vendors in all industries aggregated and curated in an easy-to-use discovery platform
Follow us on  
Upload your Assets  
JOIN CONTENTREE
  • Blogs
  • Vendor Centers
  • Solution Sets
  • About us
  • Contact us
© 2025 Contentree.  All Rights Reserved   |   Privacy and Cookies   |   Legal   |   Do not sell my info