Case Study
Success through teamwork for landmark California project
When building the Grand Central Station of the future, it’s important to have a team of designers, engineers and contractors that will be there from the beginning to the end. Viega played a role in designing and installing radiant cooling and heating in the Anaheim Regional Transportation Intermodal Center (ARTIC). Centrally located in Orange County, CA, ARTIC will provide transportation service for three million local residents as well as