Case Study

Subcontractor Pushes Five-Axis To The MAXX With hyperMILL®

Subcontractor Pushes Five-Axis To The MAXX With hyperMILL®

Pages 3 Pages

Beechwood Engineering Subcontractor pushes five-axis to the MAXX with hyperMILL ® Established in 1977, Beechwood Engineering started trading in a small unit near Blackpool and its rapid expansion noted a subsequent move to a purpose built factory in Poulton-le-Fylde. The success of the company has been based on its decision to invest in advanced machine tool technology that has been complemented by the latest machine tool and CAM software s

Join for free to read